NEXUSFRAMEWORKS

ONONDAGA COUNTY · TOWN GUIDE

Solar in Cicero, NY

Everything about solar in Cicero in one place: what a land lease could pay, projects proposed near you, battery storage, community solar and solar for your home.

Solar farm potentialGrid data pendingLand looks workable; grid capacity is not in our data yet

Lease your land for a solar farm

105
parcels with 10+ buildable acres
3
solar farms operating (15 MW)
2023
local solar law adopted

What could your land earn?

Solar leases upstate pay about $1,000–$1,500 an acre a year, usually for 25 years or more.

$30,000–$45,000 a year

One 5 MW community solar farm leases about 30 acres.

Check your land in Cicero →

Free. We look at your exact parcel and send the report to you only.

Cicero at a glance

Summit - Cicero (5 MW)Cicero Energy Storage 2, LLC (5 MW)Community solar farm (5 MW)Source Power II - Taft CSG (3.7 MW)Bartell South PV I (3 MW, planned)2 milesN

Operating solar farmPlanned projectTown of Cicero

Dot size follows farm size. Town boundary: U.S. Census Bureau.

What we know about Cicero

  • Cicero adopted a local solar law in 2023, so the rules for solar farms are set.
  • The utility's grid capacity map for Cicero is not in our data yet, so the power line is the open question; a parcel report checks it directly.
  • The town opted out of the state's solar property-tax exemption in 2024: solar farms here pay full property tax, which some developers weigh.

How Cicero compares

  • Cicero has the 14th most large open parcels of 19 towns in Onondaga County.
  • 17 of the 19 towns here have a local solar law; Cicero is one of them.

Town rules for solar

Local solar lawAdopted 2023
Sets setbacks, screening, fencing and removal rules for solar farms.
Solar moratoriumNone in force
New projects can apply.
Battery storage moratoriumNone in force
Solar property-tax exemption (RPTL 487)Town opted out in 2024
Solar farms pay full property tax or negotiate a payment in lieu of taxes.

From local laws filed with the NYS Department of State. Confirm current rules with the town clerk before signing.

Solar farms in Cicero

FarmMW ACOnlineType
Summit - Cicero52024Community solarMap
Cicero Energy Storage 2, LLC52022Community solarMap
Community solar farm52022Community solarMap

Every solar farm in Onondaga County

Projects proposed near you

Solar farms proposed in or within 5 miles of Cicero

ProjectTownMW ACStageExpected
Bartell South PV ICicero3Under constructionOct 2026

Listed with a Cicero address

The site may be in a neighbouring town.

ProjectMW ACStageExpected
Cicero solar5Grid upgrades paid

Battery storage proposed near Cicero

ProjectMW ACStageExpected
Brewerton battery storage4.9Applied to utility
Brewerton battery storage4.9Applied to utility
Brewerton battery storage4.9Applied to utility

Data centers proposed in Onondaga County

  • Ranalli SuperDC, Onondaga: Grid study, 270 MW requested

Get an email when a project near Cicero is proposed or moves forward. Free, and you can stop any time.

Set up alerts →

From the NYISO and utility interconnection queues, EIA-860M, NYSERDA and the state siting office (ORES), checked weekly.

Battery storage

Battery storage projects need far less land than solar farms, usually a few acres close to a substation or a power line with room to connect, and developers lease land for them the same way.

Cicero has no battery storage moratorium in force.

3 grid battery sites operate in Onondaga County today, plus 21 home batteries.

Ask about a battery lease →

Community solar

Community solar lets you get credit on your electric bill from a nearby solar farm, with no panels on your roof. It works for renters and homeowners alike.

There are 12 community solar farms within 10 miles of Cicero, on the National Grid grid. Subscriptions are open to customers of the same utility.

Partners coming soon. We are lining up community solar companies serving Onondaga County. Leave your details and we will tell you when you can subscribe.

Tell me when it opens →

Solar for your home

In Onondaga County, each kilowatt of rooftop panels facing south makes about 1,231 kWh a year, so a typical 7 kW home system makes roughly 8,616 kWh a year. East- or west-facing roofs make less; shade and snow matter too.

Installer partners coming soon. Nexus does not install panels. We will refer you to a few vetted local installers and tell you up front if they pay us for the introduction.

Tell me when it opens →

Questions people in Cicero ask

How much do solar developers pay to lease land in Cicero, NY?

Upstate New York solar leases typically pay $1,000 to $1,500 an acre a year, with deals from $250 to $2,500. A 5 MW community solar farm uses about 30 acres, so one farm on your land would pay roughly $30,000 to $45,000 a year.

Does Cicero allow solar farms?

Cicero adopted a local solar law in 2023, so the rules for solar farms are set. Rules on setbacks, screening and removal are in the town's law; confirm them with the town clerk.

Is my land good for a solar farm?

Developers want about 10 acres or more of flat, dry, open land within about a mile of a three-phase power line that has room for new solar. In Cicero, 105 parcels meet the land test. Check your land to see where yours stands.

How long does a solar lease last?

Most solar farm leases run about 25 years, often with options to extend. The developer removes the equipment at the end, and the lease should say who pays for that and how the land is restored.

What does Cicero's tax opt-out mean for a solar lease?

New York's Real Property Tax Law section 487 lets solar systems skip property-tax increases for 15 years. Cicero opted out in 2024, so a solar farm here pays property tax or a negotiated payment in lieu of taxes. That means more money for the town, and a cost developers weigh when choosing sites.

Towns next to Cicero

All towns in Onondaga County · All county guides

About this guide

Written and maintained by Aaron Williams, founder of Nexus Frameworks in Syracuse. The figures come from public records run through the Nexus spatial data engine and refresh every week. It is a desk estimate, not an appraisal, legal advice or an offer from a developer.

How Nexus is paid: the land check and this guide are free. If we introduce you to a developer, installer or community solar company, they may pay Nexus a referral fee; we tell you before any introduction.