Everything about solar in Camillus in one place: what a land lease could pay, projects proposed near you, battery storage, community solar and solar for your home.

Solar farm potentialFew large parcelsMost land here is too small or built up for a solar farm

Lease your land for a solar farm

78
parcels with 10+ buildable acres
1
solar farm operating (10 MW)
2023
local solar law adopted

What could your land earn?

Solar leases upstate pay about $1,000–$1,500 an acre a year, usually for 25 years or more.

$30,000–$45,000 a year

One 5 MW community solar farm leases about 30 acres.

Check your land in Camillus →

Free. We look at your exact parcel and send the report to you only.

Camillus at a glance

CAMILLUS A (CSG) (10 MW)NY Van Buren II CSG (3 MW)NY-Sun project, Camillus (5.39 MW, planned)2 milesN

Operating solar farmPlanned projectTown of Camillus

Dot size follows farm size. Town boundary: U.S. Census Bureau.

What we know about Camillus

  • Camillus adopted a local solar law in 2023, so the rules for solar farms are set.
  • Battery storage projects are on hold in Camillus until March 16, 2027.

How Camillus compares

  • Camillus has the 15th most large open parcels of 19 towns in Onondaga County.
  • 17 of the 19 towns here have a local solar law; Camillus is one of them.

Town rules for solar

Local solar lawAdopted 2023
Sets setbacks, screening, fencing and removal rules for solar farms.
Solar moratoriumNone in force
New projects can apply.
Battery storage moratoriumUntil March 16, 2027
Battery projects are paused; solar is not affected.
Solar property-tax exemption (RPTL 487)Exemption applies
New solar systems can get a 15-year property-tax exemption.

From local laws filed with the NYS Department of State. Confirm current rules with the town clerk before signing.

Solar farms in Camillus

FarmMW ACOnlineType
CAMILLUS A (CSG)102024Community solarMap

Every solar farm in Onondaga County

Projects proposed near you

Solar farms proposed in or within 5 miles of Camillus

ProjectTownMW ACStageExpected
NY-Sun project, CamillusCamillus5.39In development (NY-Sun)

Battery storage proposed near Camillus

ProjectMW ACStageExpected
Camillus battery storage4.9Grid upgrades paid
Camillus battery storage4.9Utility study
Camillus battery storage5.88Applied to utility
Camillus battery storage4.89Applied to utility
Camillus battery storage4.89Applied to utility

Data centers proposed in Onondaga County

  • Ranalli SuperDC, Onondaga: Grid study, 270 MW requested

Get an email when a project near Camillus is proposed or moves forward. Free, and you can stop any time.

Set up alerts →

From the NYISO and utility interconnection queues, EIA-860M, NYSERDA and the state siting office (ORES), checked weekly.

Battery storage

Battery storage projects need far less land than solar farms, usually a few acres close to a substation or a power line with room to connect, and developers lease land for them the same way.

Battery storage projects are paused in Camillus until March 16, 2027. A lease can still be discussed, but nothing can be built before then.

3 grid battery sites operate in Onondaga County today, plus 21 home batteries.

Ask about a battery lease →

Community solar

Community solar lets you get credit on your electric bill from a nearby solar farm, with no panels on your roof. It works for renters and homeowners alike.

There are 7 community solar farms within 10 miles of Camillus, on the National Grid grid. Subscriptions are open to customers of the same utility.

Partners coming soon. We are lining up community solar companies serving Onondaga County. Leave your details and we will tell you when you can subscribe.

Tell me when it opens →

Solar for your home

In Onondaga County, each kilowatt of rooftop panels facing south makes about 1,231 kWh a year, so a typical 7 kW home system makes roughly 8,616 kWh a year. East- or west-facing roofs make less; shade and snow matter too.

Installer partners coming soon. Nexus does not install panels. We will refer you to a few vetted local installers and tell you up front if they pay us for the introduction.

Tell me when it opens →

Questions people in Camillus ask

How much do solar developers pay to lease land in Camillus, NY?

Upstate New York solar leases typically pay $1,000 to $1,500 an acre a year, with deals from $250 to $2,500. A 5 MW community solar farm uses about 30 acres, so one farm on your land would pay roughly $30,000 to $45,000 a year.

Does Camillus allow solar farms?

Camillus adopted a local solar law in 2023, so the rules for solar farms are set. Rules on setbacks, screening and removal are in the town's law; confirm them with the town clerk.

Is my land good for a solar farm?

Developers want about 10 acres or more of flat, dry, open land within about a mile of a three-phase power line that has room for new solar. In Camillus, 78 parcels meet the land test. Check your land to see where yours stands.

How long does a solar lease last?

Most solar farm leases run about 25 years, often with options to extend. The developer removes the equipment at the end, and the lease should say who pays for that and how the land is restored.

Towns next to Camillus

All towns in Onondaga County · All county guides

About this guide

Written and maintained by Aaron Williams, founder of Nexus Frameworks in Syracuse. The figures come from public records run through the Nexus spatial data engine and refresh every week. It is a desk estimate, not an appraisal, legal advice or an offer from a developer.

How Nexus is paid: the land check and this guide are free. If we introduce you to a developer, installer or community solar company, they may pay Nexus a referral fee; we tell you before any introduction.